Blog topic
Operations craft
Practitioner know-how for better loss meetings.
OEE above 100%? Why a reported OEE can't be right
An OEE over 100% means the inputs are wrong. Here are the common reasons a reported OEE fails the sniff test, from a plant manager's point of view.
26 Oct 2026 · 3 min read
The Monday loss meeting: why one ranked loss beats twenty
A loss meeting works when it leaves with one ranked loss, one owner and one date. Here is how to run it, and what to do with the other nineteen.
6 Oct 2026 · 3 min read